Working closely with the contractor and our client we installed a Kawneer unitised system at the Lowry Hotel in Manchester.

This method required us to work with a variety of installation techniques, including the use of cranes, Cherry Pickers and an Ergonomic Manipulation Unit (EMU). This use of lifting equipment completely eliminated the need for scaffolding.

Before the panels were installed, we had to ensure our brackets were positioned accurately. With the use of Iaser levels, we were able to achieve the levels of precision required for a contract using this glazing system.