|
 |
Working
closely with the contractor and our client we installed a Kawneer unitised system at the
Lowry Hotel in Manchester.
This method required us to work with a variety of installation techniques, including the
use of cranes, Cherry Pickers and an Ergonomic Manipulation Unit (EMU). This use of
lifting equipment completely eliminated the need for scaffolding.
Before the panels were installed, we had to ensure our brackets were positioned
accurately. With the use of Iaser levels, we were able to achieve the levels of precision
required for a contract using this glazing system. |
|